The Triple Crown RoadRailer assembly crew has arrived at the turnout at the east end of the Rutherford Triple Crown facility to help switch a single RoadRailer trailer. |
Date:
6/24/2008 |
Location:
Harrisburg, PA Map  |
Views:
457 |
Collection Of:

Rob Kitchen |
|
Author: Rob Kitchen
|
 |
Picture Categories: |
This picture is part of album: 2008 Rail Pictures |